Download Power Systems Scale-Up Technical Sales.C1000-031.BrainDumps.2020-01-20.49q.vcex

Vendor: IBM
Exam Code: C1000-031
Exam Name: Power Systems Scale-Up Technical Sales
Date: Jan 20, 2020
File Size: 31 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
A customer requires that each client partition have access to two different VLANs. VLAN tagging will NOT be used in the environment. 
  • There will be four client partitions, each of which will be connected to VLAN1 and VLAN2. 
  • There will be two VIOS. 
  • Redundant Ethernet connections will be accomplished using the Shared Ethernet Adapter (SEA) and dual VIOS. 
What is the minimum number of Ethernet ports that will be required in each VIOS?
  1. 8
  2. 4
  3. 6
  4. 2
Correct answer: B
Explanation:
Reference: https://www.ibm.com/developerworks/aix/tutorials/au-sea-config/index.html
Reference: https://www.ibm.com/developerworks/aix/tutorials/au-sea-config/index.html
Question 2
A customer has four AIX VMs, each running a different application that needs simultaneous read/write access to the same files. 
Which of the following products should be recommended?
  1. PowerHA Enterprise Edition
  2. Spectrum Scale
  3. Spectrum Protect
  4. PowerHA Standard Edition 
Correct answer: A
Question 3
A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of the servers. 
Which resource provides the SMT2 performance of the two systems?
  1. IBM Performance Management for Power Systems
  2. IBM Power Systems Performance Report
  3. IBM Power Systems Facts and Features
  4. IBM Systems Workload Estimator
Correct answer: A
Question 4
Which of the following statements is true regarding Power Enterprise Pools?
  1. The XML configuration file can be downloaded from the ESS (My Entitled Systems Support) web site.
  2. One Enterprise pool can contain the following machine types: Power Systems E870, E870C, E880C, and E980.
  3. Mobile activations can be moved within a pool at any time, without contacting IBM.
  4. A minimum of 75% of a system’s memory activation can be mobile.
Correct answer: C
Explanation:
Reference: https://www-01.ibm.com/support/docview.wss?uid=nas8N1022430
Reference: https://www-01.ibm.com/support/docview.wss?uid=nas8N1022430
Question 5
While migrating from a Power System E880 to a Power System E980, which of the following is automatically provided on both systems?
  1. PowerVM Standard Edition
  2. IBM Cloud PowerVC Manager
  3. PowerVM Enterprise Edition
  4. IBM Cloud Private
Correct answer: B
Question 6
Which IBM Power Systems Software provides network firewall services with the local virtualized server to control network traffic between LPARs?
  1. PowerSC
  2. Trusted AIX
  3. PowerVC
  4. Trusted Surveyor
Correct answer: A
Explanation:
Reference: http://www.common.be/system/files/files/Power_Systems_2013_PC.pdf (20)
Reference: http://www.common.be/system/files/files/Power_Systems_2013_PC.pdf (20)
Question 7
A customer has several workloads using LPARs. The customer desires that the maximum number of active cores be made available for each workload, a shared SAN connection, and dedicated LAN throughput for each workload. 
Which of the following satisfies the workload requirements?
  1. Dedicated donating cores, NPIV, SR-IOV network
  2. Shared Processor Pool, vSCSI, VIOS SEA 
  3. Shared Processor Pool, Dedicated HBAs, dedicated LAN adapters
  4. Shared Processor Pool, NPIV, dedicated LAN adapters
Correct answer: D
Question 8
A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements. 
How many racks units (EIA) are required?
  1. 8
  2. 9
  3. 6
  4. 10
Correct answer: C
Explanation:
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Question 9
A customer is comparing a Power Systems solution with an x86 solution for big data analytics. 
Which no-charge IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?
  1. IT Economics Study (Eagle Study)
  2. Performance Navigator
  3. System Planning Tool
  4. Workload Estimator
Correct answer: D
Explanation:
The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems. You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems. The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements Reference: https://www.ibm.com/developerworks/community/blogs/systemssupport/entry/ibm_systems_workload_estimator_and_energy_estimator2?lang=en
The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems. You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems. The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements 
Reference: https://www.ibm.com/developerworks/community/blogs/systemssupport/entry/ibm_systems_workload_estimator_and_energy_estimator2?lang=en
Question 10
A customer would like to deploy a new application that requires 7 day by 24 hour availability. 
What advantage does the Power System E980 have versus the Power System S924 to satisfy their requirement?
  1. PCIe hot plug adapters
  2. Soft error protection, recovery and self-healing
  3. Active Memory Mirroring
  4. Chipkill memory
Correct answer: C
Explanation:
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/6/877/ENUSZG18-0086/index.html&request_locale=en
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/6/877/ENUSZG18-0086/index.html&request_locale=en
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!